Currently, the Add products from another drawing function creates a copy of the product as it adds it to the drawing, in the same way the 'Add product from database' function does.
This present an issue when I want to copy a product from one drawing to another within the same assessment. It currently creates another line item in the rate build up for that product when I want it to instead populate the quantities using the already existing line item for that product in the assessment.
E.g. In zone 1 I have measures product 'Wall 1' on a drawing. I want to copy this measure to zone 2 due to it being very similar with only a small change required.
When I do this, another line item is added called 'wall 1 (copy)' and is linked to zone 2. I would like the original product 'Wall 1' to be linked to zone 2 as it's copied so I can use the copy function, but it not add multiple instances of the same product to the assessment.
Perhaps a page as part of the copy steps where you confirm which existing products, if any, you want to link the measures being copied to?
Ed Swift
last year
Currently, the Add products from another drawing function creates a copy of the product as it adds it to the drawing, in the same way the 'Add product from database' function does.
This present an issue when I want to copy a product from one drawing to another within the same assessment. It currently creates another line item in the rate build up for that product when I want it to instead populate the quantities using the already existing line item for that product in the assessment.
E.g. In zone 1 I have measures product 'Wall 1' on a drawing. I want to copy this measure to zone 2 due to it being very similar with only a small change required.
When I do this, another line item is added called 'wall 1 (copy)' and is linked to zone 2. I would like the original product 'Wall 1' to be linked to zone 2 as it's copied so I can use the copy function, but it not add multiple instances of the same product to the assessment.
Perhaps a page as part of the copy steps where you confirm which existing products, if any, you want to link the measures being copied to?