Add VE options 'below the line' in the rate build up/tender bill

Released

Estimating
Output Documents
JB

Jacqui Blakemore

3 quarters ago

  • "Below the line" flag for products in rate buildup 

  • Items excluded from contract total but visible as options (with rate per unit and quantity)

  • Ability to toggle items between main contract and VE options 

  • Any items left as VE option, not carried over to onsite project when the tender is accepted 

  • In the tender bill, VE options shown in a separate section after the main contract total (but on the same page)