Released
Jacqui Blakemore
3 quarters ago
"Below the line" flag for products in rate buildup
Items excluded from contract total but visible as options (with rate per unit and quantity)
Ability to toggle items between main contract and VE options
Any items left as VE option, not carried over to onsite project when the tender is accepted
In the tender bill, VE options shown in a separate section after the main contract total (but on the same page)
Jacqui Blakemore changed the status to Released
4 weeks ago
Jacqui Blakemore
3 quarters ago
"Below the line" flag for products in rate buildup
Items excluded from contract total but visible as options (with rate per unit and quantity)
Ability to toggle items between main contract and VE options
Any items left as VE option, not carried over to onsite project when the tender is accepted
In the tender bill, VE options shown in a separate section after the main contract total (but on the same page)